Architects and technical designers. We work on infrastructure buildings — depots, substations, pumping stations — where the drawing is the deliverable and the building is the consequence.
Full production information to RIBA Stage 4, coordinated in a federated model and issued as drawings because that is what gets built from.
Written clause by clause against the drawing, not assembled from a library. Every clause states its tolerance and its cross-references.
Instructions, revisions and site queries answered in under two working days, with the revision chain kept public to the whole project.