New structure carries a 60-year design life with a current-code safety factor.
Repair addresses the observed movement but not the underlying drainage.
Requires full drawdown and a temporary supply agreement.
Partial drawdown only; no temporary supply needed.
Nothing of the original east wall is retained.
Depends on the seasonal hypothesis, which the panel has not accepted.
Fixed-price contract, one contractor, no staged decision point.
Repair now does not preclude rebuild in 2032, and buys five years of monitoring.