Gallery
Ferro Brut Site Front Landing
Palette
Primary
Accent
Background
Card
Foreground
FerroRequest a quote

We pour
the things
other people
stand on.

Structural concrete, ground works and steel erection across the north. Forty-one crews. No subcontracted supervision.

A poured concrete wall with a painted hazard yellow stripe
01

Groundworks

Bulk excavation, piling mats, drainage, sub-base.

02

Structural

Slabs, cores, retaining walls, post-tensioned decks.

03

Steel

Erection, decking, fire protection, mezzanines.

04

Finishes

Power float, joint sealing, surface hardening.

Recently handed over

JobClientValueHanded over
Beckton Yard, phase 2Marden Rail£4.10mAug 2026
Hollin Bank flood wallNW Water£2.86mJun 2026
Unit 9, CarrfieldPeak Logistics£1.94mApr 2026
Kirkstall footbridgeCity Council£0.71mFeb 2026