Every note we have published, including the ones that turned out to be wrong.
The argument for the second interconnector rests on an assumption that has not been true in any of the last four winters.
Six months into the new regime, 41 projects have moved and 380 have not, and the difference is not what the reform was designed around.
Three official lists describe the same programme and none of them agree, so we reconciled them line by line.
Nominal capacity and de-rated capacity have diverged by 3.1 GW since 2022, almost entirely because of storage duration.